ellsworth street reconstruction
engineering

Streets & roads
water systems

wastewater

 treatment facilities

drainage

site design

subdivisions

Wastewater

airports

transportation

   
         
       
   
  triangle
   

Home
Contact Us
Login

FourFront Design, Inc. designed the reconstruction to Ellsworth Street at Ellsworth Air Force Base. The new Street replaced the existing roadway with a four-lane concrete roadway system, including curb, gutter and storm sewer. The replacement increased traffic flow and improved drainage capacity for one of the main roadways on the Air Force Base.

The roadway design (approximately one mile with pavement marking and lighting layout), was created using a sophisticated modeling program to provide accurate and precise design. The project totaled approximately $2.5 million.

Client:

Department of the Air Force

Ellsworth Air Force Base, SD

Phone: 605-385-2546

Liberty Boulevard Highway 16 Corridor Studyellsworth street
Blue Line
architectureEngineeringGISSurveyingcareersvalue added services