FourFront Design, Inc. completed a feasibility study for the City of Martin, whereby the existing water distribution system, supply and storage capabilities were analyzed. It was determined from the reports that the city was in need of significant water improvements, such as improving the City's inadequate distribution system. An 8" water main was placed along the west end of the city looping the existing line, and a new well and reservoir were added. This $200,000 project included the design of an 800' deep well in the Arikee Formation within Martin city. Client: City of Martin 101 Main Street, Martin, SD 57551 Phone: 605-685-6525 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||